We provide a comprehensive service for all aspects of waste water engineering from collection to disposal in an environmentally sustainable manner. We have successfully delivered treatment facilities ranging in size from villages to large towns and are focused on value for money solutions from project conception to construction. We understand that as projects evolve client's requirements may change, and through flexible working relationships we offer clients an unparalleled service in this regard.
|
- Urban Drainage
- Municipal
- Industrial
- Sludge
- Alternative Technologies
 |
Portarlington Sewerage Scheme
Upgrade of Portarlington Wastewater Treatment Works |
|
 |
Foul Sewer at Ballygomartin Road, Belfast
Construction of a foul sewer by Trenchless Technology |
|
 |
Newry Sewerage Improvements
Construction of Newry Sewerage Improvements by Trenchless Technology |
|
 |
Meath Bundled Wastewater Treatment and Collection Systems
Bundled Wastewater Treatment and Collection Systems for 8 no. centres in Co. Meath |
|
 |
Leitrim Town and Village Sewerage Scheme
The upgrading and construction of Wastewater Treatment Plants and sewer networks |
|
 |
Mountmellick Sewerage Scheme, Stage 2
Preparation of Preliminary Report for scheme |
|
 |
Mountmellick Sewerage Scheme, Stage 1
Upgrade works at Mountmellick Wastewater Treatment Works and Network Pumping Stations |
|
 |
Kilcullen Sewerage Improvement Scheme
Provision of collection capacity for 6,000 p.e. , €4 million |
|
 |
Carrick-on-Suir Main Drainage
Construction of a foul and stromwater sewerage system, 11,000 p.e. , €18 million |
|
 |
Lower Liffey
Valley - Straffan Sewerage
Provision of foul and surface water in Straffan, 2,000 p.e. , €3.5 million |
|
 |
Navan Sewerage Augmentation Scheme
Wastewater collection scheme 60,000 p.e. , €28.0 million |
|
 |
The Curragh - Wastewater Transfer Scheme
Provision of a local collection scheme, 7,200 p.e. , €4.5 million |
|
 |
Dunshaughlin
Sewerage Scheme
35km of sewers with 8 river crossings, 12,000 p.e. , €34.0 million |
|
 |
Dublin Docklands Rising Mains Scheme
Design and construction of foul rising mains, 250,000 p.e. , €16 million |
|
 |
Ballivor
Sewerage Scheme
Collection Network Improvements and new Waste Water Treatment Works, 2,000 p.e. , €3.7 million |
|
| Cavan Wastewater Treatment Plant
MCC Replacement |
|
| Monasterevin Wastewater Treatment Works
Wastewater Treatment Works for the Town of Monasterevin, Co. Kildare |
|
| Gilford Wastewater Treatment Works Improvements
The refurbishment of, and extension to, an existing Wastewater Treatment Works |
|
| Shannon Airport Wastewater Treatment Works
Provision of a treatment plant to serve the airport, 5,000 p.e. , €2.8 million |
|
 |
Mortarstown Wastewater Treatment Works
Provision of an upgrade with biological nutrient removal, 36,000 p.e. , €1.5 million |
|
 |
South Tipperary Bundled DBO
Provision of 5 new WwTPs, with upgrading of 7 existing, 120,000 p.e. , €42.0 million |
|
 |
Navan Sewerage Augmentation Scheme
Provision of a Wastewater treatment plant for Navan, 60,000 p.e. , €28.0 million |
|
 |
Galway Main Drainage - Stage 3
Preliminary report for Galway City and adjacent areas of Galway County |
|
 |
Dunshaughlin Sewerage Scheme
Construction of a WwTP, 12,000 p.e. , €34.0 million |
|
 |
Leixlip WwTW - Lower Liffey Valley Sewerage Scheme
Upgrade 80,000 p.e. to 150,000pe WwTW, €13.5 million |
|
 |
Kildare Town Sewerage Scheme
New 28,000 p.e. WwTW and 15km effluent outfall, €20.0 million |
|
 |
Tubbercurry, Grange and Strandhill DBO Bundle
Design, Build and Operation of Waste Water Treatment Systems, 17,700 p.e. , €9.2 million |
|
 |
Edgeworthstown WwTW Refurbishment
Provision of inlet works / picket fence thickener / ferric dosing facility for Phosphorus Removal, 3,500 p.e. , €400,000 |
|
 |
Shannon Town Sewerage Scheme
Design and upgrade of existing treatment works and collection network |
|
 |
Birr Wastewater Treatment Expansion
Environmental Impact Statement |
|
 |
Mount Juliet Drainage
Wastewater treatment system to comply with a Trade Effluent Discharge Licence, 1,500 p.e. , €200,000 |
|
 |
Kiltilane - STEDS Project
Pilot project to review new technologies appropriate for cluster developments, 100 p.e. , €720,000 |
|
 |
Allenwood Sewerage Scheme
First time provision of sewerage infrastructure inc. Irelands 1st municipal vacuum installation, 1,500 p.e. , €4.5 million |
|
 |
Mount Juliet Drainage
Wastewater treatment system to comply with a Trade Effluent Discharge Licence, 1,500 p.e. , €200,000 |
|
 |
Ballinafad Temporary Treatment
Temporary Treatment Works for the village of Ballinafad, Co. Sligo
|
|
|
|
|
|